WelomeMainCategoriesEquipmentMisc.Maschhoff's

Aerial Photo Aerial Photo

Project funding : 75% by DNR conservation reserve enhancement program, 25% by landowner. 400-500 acres impacted.

                            

Lower crossing. Lower crossing.

The original pipe in crossing before removal. New pipe in back ground.

Old tube east end Old tube east end

enlarge

1. 1.

Old tube out.

enlarge

2. 2.

New tube.

3. 3.

New tube in.

enlarge

4. 4.

Transfering concrete from the truck to the base of the stop log structure with a backhoe. The concrete is 1' thick and a little bigger than the base of the stop log and even with the bottom of the pipe. This will support the stop log and keep it in place.

enlarge

5. 5.

Backhoe placing concrete around stop log.

enlarge

6. 6.

West end of new pipe.

enlarge

7. 7.

3"x 6" treated planks are placed in the inlet to control the water level above the crossing.

enlarge

8. 8.

enlarge

Upper crossing Upper crossing

Same as lower tube except this one is a little smaller. Stop log planks are piled on top of structure.